Update on Edenborn Drainage Project


Here is the most recent update on the Edenborn Drainage Project:

“Required waterline work is approximately 80% complete.  Approximately 1,100 feet of 72” drain line has been installed.  Approximately 400 feet of southbound and 600 feet of northbound roadway along with associated previous concrete driveway aprons, parking bays, and sidewalks has been installed.  An additional 200 feet of northbound roadway without curb has also been installed.  The project is still anticipated to be complete by 8/1/17.”

– Mark Drewes, Director of Engineering Jefferson Parish